Title: Estimate of hourly productivity applied to elaboration and implementation of mining plans.
Other Titles: Estimativa de produtividade horária aplicada à elaboração e execução de planos de lavra.
Authors: Rodovalho, Edmo da Cunha
Cabral, Ivo Eyer
Keywords: Mine planning
Produtividade horária
Multiple regressions
Gerenciamento operacional
Issue Date: 2014
Citation: RODOVALHO, E. da C.; CABRAL, I. E. Estimate of hourly productivity applied to elaboration and implementation of mining plans. Revista Escola de Minas, v. 67, p. 221-227, 2014. Disponível em: <http://www.scielo.br/scielo.php?pid=S0370-44672014000200015&script=sci_arttext>. Acesso em: 06 mar. 2015.
Abstract: Para elaboração de planos de lavra, é necessário adotar parâmetros de produtividade horária dos equipamentos disponíveis para sua execução. Esses equipamentos devem estar em sincronia com a capacidade produtiva das operações unitárias de lavra mineira: perfuração de rocha, desmonte, carregamento e transporte. Esse estudo trata da estimativa de índices de produtividade horária das operações de carregamento e transporte com a utilização de regressões múltiplas. Através da utilização da base de dados do sistema de gerenciamento operacional de uma mina, foram geradas equações que explicam o ciclo produtivo de cada um dos equipamentos de carga e das frotatransporte. Conhecendo-se o comportamento das principais variáveis que exercem influência na produtividade horária, foi possível estimar esse índice e garantir alta exequibilidade para o plano de lavra, pois os índices obtidos foram muito próximos dos reais. A formulação do modelo foi realizada de forma simples, utilizando-se de conceitos estatísticos e de ferramentas computacionais, sendo o modelo sustentado por uma boa correlação entre as variáveis. Esse fator foi decisivo para que esse estudo obtivesse bons resultados na execução dos planos de lavra estudados.
metadata.dc.description.abstracten: In order to elaborate a mine plan, it is necessary to adopt hourly production parameters for the equipment available for its execution. This equipment should be in synchrony with the productive capacity of the operational units in the mine for: rock drilling, blasting, loading and transporting ore. This study deals with the estimate of hourly production indexes for loading and transport obtained by the use of multiple regressions. Using a management system database from an operating mine, equations were generated to explain the productive cycle of each of the loading machines and dump trucks. Knowing the behavior of the principle variables that exert influence on the production schedule, it was possible to estimate the index and to guarantee high feasibility for the mine plan, considering the indexes obtained were very close to those executed. The model design was created in a simple manner, using statistical concepts and computational tools, being supported by good correlation between the variables. This factor was decisive in obtaining good results in the execution of the studied mining plan.
URI: http://www.repositorio.ufop.br/handle/123456789/5008
metadata.dc.identifier.doi: http://dx.doi.org/10.1590/S0370-44672014000200015
ISSN: 1807-0360
metadata.dc.rights.license: A Revista Escola de Minas - REM - autoriza o depósito de cópia de artigos dos professores e alunos da UFOP no Repositório Institucional da UFOP. Contato em 12 set. 2013.
Appears in Collections:DEMIN - Artigos publicados em periódicos

Files in This Item:
File Description SizeFormat 
ARTIGO_EstimateHourlyProductivity.pdf288,14 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.