Título: Avaliação de variáveis operacionais da jigagem de minério de ferro por meio de planejamento estatístico.
Título(s) alternativo(s): Evaluation of operating variables of jigging of iron ore by statistical planning.
Autor(es): São José, Fábio de
Barcelos, Hemerson Olimpio
Pereira, Carlos Alberto
Palavras-chave: Planejamento fatorial
Recuperação
Quadrilátero Ferrífero
Jigging process
Factorial design
Data do documento: 2019
Referência: SÃO JOSÉ, F. de; BARCELOS, H. O.; PEREIRA, C. A. Avaliação de variáveis operacionais da jigagem de minério de ferro por meio de planejamento estatístico. HOLOS, v. 3 p. 1-10, 2019. Disponível em: <http://www2.ifrn.edu.br/ojs/index.php/HOLOS/article/view/4724>. Acesso em: 10 mar. 2020.
Resumo: A jigagem é uma das técnicas mais antigas para se concentrar minérios no mundo, apropriado para empreendimentos de pequeno a médio porte, além compor, comumente, etapas de pré-concentração em grandes usinas, como uma maneira de se reduzir custos de produção. Dentro desta importante perspectiva da jigagem, foi proposta e realizada uma campanha de testes laboratoriais visando a concentração mineral por jigagem, a fim de avaliar algumas variáveis de influência na concentração de um minério de ferro proveniente do Quadrilátero Ferrífero (mina de Brucutu). Um planejamento fatorial foi elaborado, o qual constituiu em análise estatística precisa dos experimentos realizados. Por meio da combinação de três variáveis estudadas obteve-se recuperação de ferro igual a 73,14%, com distribuição de sílica de 89,05% no rejeito e índice de seletividade de 3,80. Assim, a metodologia permitiu uma avaliação estatística útil e possibilitou contribuir para a tomada de decisões sobre os parâmetros de interesse no processo de jigagem.
Resumo em outra língua: The jigging process is one of the oldest ways used to concentrate ores in the world, suitable for small and medium-sized employability, and is composed of a preconcentration step as a way to reduce costs. Within this perspective, a test campaign for laboratorial mineral concentration was set up, in order to determine the main variables (and their interactions) that may have an influence on the concentration of iron ore from the Iron Quadrangle by the jigging process. A factorial planning was prepared, so that an accurate statistical analysis of experiments could be performed. A combination of the three variables studied (feed granulometry, background layer and bed mass) promoted an iron recovery equal to 73.14%, a distribution of silica of 89.05% on the tailing and a selectivity index of 3.80. Thus the methodology enabled a useful statistical evaluation and can contribute to decision-making regarding the parameters of interest in the jigging process.
URI: http://www.repositorio.ufop.br/handle/123456789/12264
DOI: https://doi.org/10.15628/holos.2019.4724
ISSN: 1807-1600
Licença: O periódico Holos permite que o Repositório Institucional da Universidade Federal de Ouro Preto (UFOP) deposite uma cópia eletrônica dos artigos publicados por esse periódico em que ao menos um dos autores faça parte da comunidade cientifica da UFOP. Fonte: Licença concedida mediante preenchimento de formulário em 11 mar. 2015.
Aparece nas coleções:DEMIN - Artigos publicados em periódicos

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
ARTIGO_AvaliaçãoVariáveisOperacionais.pdf443,88 kBAdobe PDFVisualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.