Please use this identifier to cite or link to this item: http://www.repositorio.ufop.br/jspui/handle/123456789/11890
Title: Ação dinâmica do desmonte de rochas por explosivos em barragem de rejeito.
Authors: Ferreira, Fabiano Veloso
metadata.dc.contributor.advisor: Silva, José Margarida da
Arroyo Ortiz, Carlos Enrique
Keywords: Lavra de minas
Vibrações
Explosivos
Issue Date: 2020
metadata.dc.contributor.referee: Arroyo Ortiz, Carlos Enrique
Torres, Vidal Félix Navarro
Silva, Valdir Costa e
Citation: FERREIRA, Fabiano Veloso. Ação dinâmica do desmonte de rochas por explosivos em barragem de rejeito. 2020. 73 f. Dissertação (Mestrado em Engenharia Mineral) - Escola de Minas, Universidade Federal de Ouro Preto, Ouro Preto, 2020.
Abstract: Na atualidade, devido a necessidade de otimizar os processos da mineração de forma global o conceito Mine-to-Plant se torna imperativo devido a necessidade de aproveitar da melhor forma a energia gerada na escavação com explosivos, objetivando a melhor fragmentação de rocha possível que atenda as operações subsequentes. Contudo energia remanescente da fragmentação gera efeitos secundários tal como as vibrações, causando danos a estruturas como por exemplo as barragens de rejeito. Este trabalho apresenta um estudo baseado no controle e monitoramento das vibrações geradas pela detonação de explosivos durante o desmonte de rochas. O objetivo principal é estudar o comportamento das vibrações para evitar possíveis danos a uma barragem de rejeitos localizada próxima a mina. A metodologia foi baseada em dados de monitoramentos sísmicos realizados em uma mina no quadrilátero ferrífero mineiro (MG), através da utilização do software comercial juntamente com o método de simulação de Monte Carlo, foi possível determinar a atenuação das vibrações pela mina e gerar um mapa de isovelocidades, assim como a sua probabilidade de ocorrência. Pelo avaliado neste estudo é possível afirmar que pode se utilizar valores acima de 1000 Kg para as frentes de lavra mais distantes da barragem (em torno de 3000m), enquanto para a região mais próxima é aconselhável manter a carga máxima aplicada de 53 Kg, podendo aumentar a carga até valores próximos a 130 Kg para distancias próximas a 1000 m da barragem. Pela análise probabilística, foi possível considerar uma alta probabilidade de ocorrência dos desmontes realizados com 53 Kg de carga máxima por espera atingirem valores de velocidade pico de partícula equivalentes a 0,1 mm/s na barragem de rejeito. Ao mesmo tempo, apresentam baixos valores de probabilidade de alcançar valores equivalentes a 1 mm/s na barragem, indicando que a metodologia de desmonte aplicada representa uma baixa influencia quanto a vibrações no terreno.
metadata.dc.description.abstracten: Nowadays due to the need of a global mineral process optimization, the Mine-to-Plant concept becomes imperative, in need for performing a rock blasting process with a better exploitation of the energy released by explosives. Although, the remaining energy from rock fragmentation generates secondary effects, which can cause harm to structures, like the tailings dams. Due to that fact, this study is based on the monitoring and control of the vibrations, which are one of the secondary effects of rock blasting. The main goal is to study different ways to perform a blast design to attend the fragmentation demand, with the vibrations limits for the structures. The methodology applied for this paper, is based on the utilization of the seismic monitoring data from an open pit iron mine located in the State of Minas Gerais (MG) – Brazil. Where with a commercial software, the attenuation law of ground vibration was determined, an iso-velocity mine map was made and with the application of Monte Carlo simulation method, it was be possible to measure the influence of the rock blasting vibrations and the probability of occurrence for vibration values to surpass the limiting values for peak particle velocity. By this study, it was possible to affirm that there is a possibility for applying a maximum charge per delay of 1000 kg for distances around 3000 m from the tailing dam. In addition, for distances closer than 1000 m it is more appropriate to keep charge values around 53 kg. By the probabilistic simulation analysis, it was possible to consider a relative high probability occurrence for the rock blasting operations inside the mine to achieve values of 0.1 mm/s for peak particle velocity. However, this operation could not register high values for peak particle values of 1 mm/s at the tailing dam showing that the rock blasting practiced over the mine may not represent a bad influence when considering ground vibrations.
Description: Programa de Pós-Graduação em Engenharia Mineral. Departamento de Engenharia de Minas, Escola de Minas, Universidade Federal de Ouro Preto.
URI: http://www.repositorio.ufop.br/handle/123456789/11890
metadata.dc.rights.license: Autorização concedida ao Repositório Institucional da UFOP pelo(a) autor(a) em 23/01/2020 com as seguintes condições: disponível sob Licença Creative Commons 4.0 que permite copiar, distribuir e transmitir o trabalho desde que sejam citados o autor e o licenciante. Não permite o uso para fins comerciais.
Appears in Collections:PPGEM - Mestrado (Dissertações)

Files in This Item:
File Description SizeFormat 
DISSERTAÇÃO_AçãoDinâmicaDesmonte.pdf3,46 MBAdobe PDFView/Open


This item is licensed under a Creative Commons License Creative Commons